AI Data Center Construction Drives Surge in Copper Demand
Written by Emily J. Thompson, Senior Investment Analyst
Updated: Jun 19 2026
0mins
Source: Fool
- Surge in Copper Demand: According to the Copper Development Association, traditional data centers require between 5,000 and 15,000 tons of copper, while AI data centers can demand up to 50,000 tons, indicating a massive need for copper in AI infrastructure, with projections showing AI data centers could consume half a million tons annually by 2030, driving copper prices higher.
- Investment Trends: Goldman Sachs estimates that cloud computing providers will invest $765 billion in AI infrastructure over the next decade, with expectations to exceed $1.6 trillion by 2031, further intensifying copper demand and impacting the global market.
- Widening Supply Gap: A study by S&P Global indicates that global copper supply will be 24% short of demand by 2040, which has contributed to a 57% increase in copper prices over the past five years, suggesting that investing in copper is a smart move for the future.
- Performance of Major Copper Producers: Freeport-McMoRan (FCX) and Southern Copper (SCCO), as the world's largest copper producers, have seen their stock prices rise by 70% and more than double respectively over the past year, highlighting the significance and potential returns of the copper industry in the context of AI data center construction.
Trade with 70% Backtested Accuracy
Stop guessing "Should I Buy FCX?" and start using high-conviction signals backed by rigorous historical data.
Sign up today to access powerful investing tools and make smarter, data-driven decisions.
Analyst Views on FCX
Wall Street analysts forecast FCX stock price to fall
15 Analyst Rating
13 Buy
2 Hold
0 Sell
Strong Buy
Current: 60.970
Low
46.00
Averages
58.79
High
70.00
Current: 60.970
Low
46.00
Averages
58.79
High
70.00
About FCX
Freeport-McMoRan Inc. is a metals company. The Company operates assets with reserves of copper, gold and molybdenum. Its portfolio of assets includes the Grasberg minerals district in Indonesia, which is a copper and gold deposit; and operations in the United States, including the large-scale Morenci minerals district in North America and the Cerro Verde operation in South America. Its segments include Cerro Verde copper mine, Indonesia operations and United States Rod & Refining operations. It produces copper concentrate, cathode and continuous cast copper rod. Its copper ore from mines is processed by smelting and refining or by solution extraction and electrowinning (SX/EW). It produces copper cathodes at an electrolytic refinery located in El Paso, Texas. The SX/EW cathode is produced from the Morenci, Bagdad, Safford, Sierrita, Miami, Chino and Tyrone mines in the United States, and from the Cerro Verde and El Abra mines in South America.
About the author

Emily J. Thompson
Emily J. Thompson, a Chartered Financial Analyst (CFA) with 12 years in investment research, graduated with honors from the Wharton School. Specializing in industrial and technology stocks, she provides in-depth analysis for Intellectia’s earnings and market brief reports.
- Metals Supercycle Argument: Long-term spending on decarbonization, electrification, renewable energy, and AI infrastructure is expected to boost demand for miners, particularly benefiting companies like Freeport-McMoRan, which presents a more favorable risk/reward profile compared to MP Materials.
- Risks of MP Materials: While MP Materials is a strong player in the rare earth sector, the execution risks associated with its Northlake, Texas facility and the controversial partnership with the U.S. Department of Defense may deter investors, especially in light of recent Chinese export controls.
- Growing Demand for Copper: Copper's extensive use in data centers and electric vehicles, where it is utilized multiple times more than in internal combustion engines, underscores its critical role in the electrification trend, suggesting potential price increases in the future.
- Freeport-McMoRan's Production Outlook: The company forecasts copper sales to rise from 3.1 billion pounds in 2026 to 4.1 billion pounds by 2028, while its cost-effective leaching initiative aims to add 800 million pounds annually by 2030, indicating strong growth potential and lower downside risk compared to MP Materials.
See More
- Strong Copper Demand: Freeport-McMoRan is projected to achieve copper sales of 3.1 billion pounds in 2026, increasing to 3.8 billion in 2027 and 4.1 billion in 2028, indicating robust growth potential in the copper market, particularly amid rising demand for electrification and renewable energy.
- Innovative Leaching Technology: The company aims to recover up to 400 million pounds of copper annually by 2027 and 800 million by 2030 through its cost-effective leaching initiative, which not only enhances production efficiency but also reduces operational costs, thereby strengthening its competitive position.
- Expansion Project Pipeline: Freeport-McMoRan's multiple expansion projects in the U.S. are expected to boost copper production from 1.2 billion pounds to 2 billion pounds, further solidifying its market position in the metals supercycle alongside the implementation of its leaching initiative.
- Optimistic Market Outlook: With ongoing copper demand growth and supply constraints, Freeport-McMoRan is viewed as a more attractive investment compared to MP Materials, especially in the context of a long-term metals supercycle, offering investors the potential for substantial returns.
See More
- Market Divergence: On Thursday, the S&P 500 closed unchanged, while the Dow Jones Industrial Average rose 1.14% to a new all-time high, and the Nasdaq 100 fell 1.61%, indicating a split in market sentiment, particularly due to the ongoing weakness in chip stocks impacting the broader market.
- Employment Data Impact: US nonfarm payrolls rose by 57,000 in June, significantly below the expected 113,000, although the unemployment rate unexpectedly fell to a one-year low of 4.2%, suggesting a stronger labor market than anticipated, which may influence the Fed's interest rate decisions.
- Chipmaker Declines: Chipmakers faced another sell-off on Thursday, with the iShares Semiconductor ETF dropping over 5%, and SanDisk and KLA Corp falling more than 14% and 12%, respectively, reflecting growing market concerns over the sustainability of the AI buildout boom.
- Oil Price Decline Impact: WTI crude oil prices fell to a fresh 4.25-month low as UAE ramped up shipments by 30% in June, restoring exports to pre-war levels, a trend that may further lower inflation expectations and affect market sentiment.
See More
- Employment Data Impact: US nonfarm payrolls rose by 57,000 in June, significantly below the expected 113,000, with May's figures revised down to 129,000, indicating a slowdown in the labor market that could influence the Fed's interest rate decisions and suppress stock market performance.
- Mixed Market Performance: The S&P 500 index is up 0.10% and the Dow Jones Industrial Average is up 0.85%, while the Nasdaq 100 index is down 0.92%, reflecting cautious sentiment towards tech stocks, particularly amid ongoing weakness in chipmakers and AI infrastructure stocks.
- International Market Dynamics: Overseas stock markets are generally rising, with the Euro Stoxx 50 reaching a new record high, indicating global investor optimism about economic recovery, which may provide support for the US market.
- Oil Price Fluctuations: WTI crude oil prices have fallen over 1% to a fresh 4.25-month low due to increased global supplies, with UAE ramping up shipments by 30% in June, which could impact the performance of energy-related stocks.
See More
- Westrock Coffee Options Activity: As of now, Westrock Coffee Co (Ticker: WEST) has seen an options volume of 5,220 contracts, equating to approximately 522,000 shares, which represents a significant 71.1% of its average daily trading volume of 734,660 shares over the past month, indicating heightened market interest in the stock.
- High Liquidity Put Options: Within Westrock Coffee, the $8 strike put option has been particularly active, with 5,216 contracts traded today, representing about 521,600 shares, reflecting investor expectations of potential downward price movement, which could impact stock volatility.
- Circle Internet Options Activity: Circle Internet Group Inc (Ticker: CRCL) has experienced even higher options trading volume, reaching 80,914 contracts, or approximately 8.1 million shares, accounting for 61.4% of its average daily trading volume of 13.2 million shares over the past month, showcasing strong market interest in the company.
- High Liquidity Put Options: For Circle Internet, the $73 strike put option has seen a trading volume of 6,010 contracts, representing around 601,000 shares, indicating a cautious sentiment among investors regarding the stock's future performance, which may influence its short-term market behavior.
See More
- Mixed Market Performance: The S&P 500 index fell by 0.10% and the Nasdaq 100 index dropped by 0.43%, while the Dow Jones Industrial Average rose by 0.35%, indicating a divergence in market sentiment, particularly under pressure from chipmakers.
- Chip Sector Pressure: Ahead of Micron Technology's earnings report, chipmakers saw declines, reflecting market concerns over AI infrastructure demand, despite Micron's stock rising over 260% this year, highlighting the volatility in tech stocks.
- Oil Price Impact: WTI crude oil prices sank to a 3.5-month low, leading to a drop in bond yields, with the 10-year Treasury yield falling to 4.40%, benefiting sectors like homebuilders and airlines by enhancing profit outlooks amid lower fuel costs.
- Decline in New Home Sales: U.S. May new home sales unexpectedly fell by 7.3% to 580,000 units, below the expected 640,000, indicating weakness in the housing market that could affect future economic growth expectations.
See More










