Loading...

Intellectia LogoIntellectia
AI Trading Bot
Features
Markets
News
Resources
Pricing
Get Started
  1. Home
  2. Stock
  3. AIBZ
AIBZ logo

AIBZ Overview

-
$
0.000
0.000(0.000%)
At close
0.000(0.000%)Aft-market
ET
$
0.000
0.000(0.000%)
At close
0.000(0.000%)Aft-market
ET
OverviewStock Price PredictionTechnicalValuationFinancialsEarningsShould I BuyNews & Events
an image of Intellectia Logoan image of Intellectia

Most Trusted AI Platform for Winning Trades

TwitterYoutubeQuoraDiscordLinkedinTelegram

Copyright © 2026 Intellectia.AI. All Rights Reserved.

Company

  • Home
  • Contact
  • About Us
  • Press
  • Privacy
  • Terms of Service
  • Service Terms of Use

Resources

  • Blog
  • Tutorial
  • Help Center
  • Affiliate Program

Markets

  • Market Analysis
  • Crypto
  • Featured Screeners
  • AI Earnings Calendar
  • Market Movers
  • Stock Monitor
  • Economic Calendar
  • All US Stocks
  • All Cryptos

Tools

  • Dividend Calculator
  • Dividend Yield Calculator
  • Options Profit Calculator

Features

  • QuantAI Alpha Pick
  • SwingMax Portfolio
  • Swing Trading
  • AI Stock Picker
  • Whales Auto Tracker
  • Daytrading Center
  • Patterns Detection
  • AI Screener
  • Financial AI Agent
  • Backtesting Playground
  • AI Earnings Prediction
  • Stock Monitor
  • Technical Analysis

News

  • Overview
  • Top News
  • Daily Market Brief
  • Earnings Analysis
  • Newswire
  • Stock News
  • Crypto News
  • Institution News
  • Congress News
  • Monitor News

Compare

  • TradingView
  • SeekingAlpha
Intellectia

Loading chart...

High
7.140
Open
7.140
VWAP
6.73
Vol
441.77K
Mkt Cap
352.86M
Low
6.517
Amount
2.97M
EV/EBITDA(TTM)
--
Total Shares
53.95M
EV
388.57M
EV/OCF(TTM)
--
P/S(TTM)
--
Bitzero Holdings Inc. is a Canada-based provider of IT energy infrastructure and high-efficiency power for data centers. The Company focuses on data center development, Bitcoin mining, and obtaining strategic data center hosting partnerships. The Company has four data center locations in the North American and Scandinavian regions, with its primary Norway site in Namsskogan, houses its self-mining operations. Namsskogan, Norway, its 50,000 square meter (m2) Norway facility, is located in the low-cost NO4 region and the site is powered by hydro energy. The Royrvik, Norway site is leased and sits on an approximately 8,000 m2 industrial-zoned plot in the municipality of Royrvik, powered by hydro energy. The Finland site sits on a total potential plot size of around 971,500 m2 near the port city of Pori, located in western Finland.
Show More

Events Timeline

No data

No data

News

PRnewswire
7.5
06-23PRnewswire
Bitzero Holdings Secures Low-Cost Power Capacity Amid AI Boom
  • New Power Bottleneck: Bitzero Holdings has secured over 1 gigawatt of low-cost power capacity across Norway, Finland, and the U.S., ensuring a competitive edge amid surging AI compute demand, with power costs at 3-4 cents per kilowatt-hour, significantly lower than the U.S. average of 12 cents, enhancing profitability.
  • Long-Term Contract Secures Revenue: Bitzero signed a 15-year lease agreement with OneQode Networks, projecting total revenue of approximately $2.6 billion, with implied annual revenue of $178 million and an operating margin of 85%, laying a solid foundation for future financial stability.
  • AI Compute Capability Expansion: The company deployed the latest NVIDIA Blackwell B300 servers in Norway, marking its first entry into AI compute revenue, further strengthening its market position to meet the growing enterprise AI demand.
  • Marketing Strategy: Bitzero is collaborating with CBRE to actively market its 200-megawatt data center capacity in Finland, aiming to attract hyperscale customers seeking AI infrastructure, thereby increasing market penetration and driving future growth.
Newsfilter
7.5
06-23Newsfilter
Bitzero Holdings Secures Low-Cost Power Capacity
  • Power Supply Advantage: Bitzero Holdings has secured over 1 gigawatt of low-cost power across four strategic sites in Norway, Finland, and the U.S., ensuring a competitive edge amid surging AI compute demand, with power costs at just 3-4 cents per kilowatt-hour compared to 12 cents in the U.S.
  • Long-Term Contract Signing: Bitzero signed a 15-year lease agreement with OneQode Networks, projecting total revenue of approximately $2.6 billion, with potential annual revenue of $178 million, highlighting strong market demand in the AI infrastructure sector.
  • GPU Deployment Progress: Two weeks prior to the OneQode agreement, Bitzero acquired eight NVIDIA Blackwell B300 servers, marking its first entry into AI compute revenue and further solidifying its market position.
  • Marketing Strategy: Bitzero is collaborating with CBRE to actively market its 200-megawatt power capacity in Finland, aiming to attract hyperscale customers seeking AI infrastructure, thereby enhancing its market penetration.
PRnewswire
7.5
06-19PRnewswire
BitZero Holdings' Strategic Edge in AI Infrastructure
  • Energy Sovereignty Advantage: BitZero Holdings boasts over 1 gigawatt of clean energy growth capacity across Norway, Finland, and North Dakota, with its hydro facility in Namsskogan delivering 40 MW of self-mining capacity at power costs below $0.05 per kWh, ensuring a competitive edge in AI and cryptocurrency mining.
  • Fixed Cost Structure: By owning its land and power infrastructure, BitZero maintains a relatively fixed cost base, allowing for expansion without renegotiating leases or power purchase agreements, thereby protecting margins and enhancing operational flexibility.
  • Rapid Market Response: The newly announced 110 MW Norway project is expected to be delivered by Q3 2026, generating approximately $176 million in annual revenue, significantly improving margin visibility and reducing exposure to power price volatility, addressing the urgent market demand for quickly deployable compute capacity.
  • Investor Interest: Despite institutional investors showing strong interest in BitZero's asset base and power-first model, the company remains undervalued relative to peers, indicating a market underestimation of its potential in the data center and AI infrastructure sectors.
Newsfilter
7.5
06-19Newsfilter
BitZero Holdings' Strategic Advantage in AI Infrastructure
  • Energy Sovereignty Advantage: BitZero Holdings has assembled over 1 gigawatt of clean energy growth capacity across four strategic sites in Norway, Finland, and North Dakota, with its hydro-powered facility in Namsskogan, Norway, providing 40 MW of self-mining capacity at under $0.05 per kWh, ensuring competitiveness in the AI and data center markets.
  • Profitability Enhancement: Each million dollars of capital deployed into BitZero's grid and mining equipment generates approximately $700,000 in annual net profit, and this efficient vertical integration model provides significant advantages in power costs, protecting margins and supporting expansion.
  • Rapid Market Response: BitZero's newly announced 110 MW Norway project is expected to launch in 2026, generating approximately $176 million in annual revenue, and due to secured power access and existing infrastructure, the project delivery speed far exceeds competitors, addressing urgent demands for rapidly deployable compute capacity.
  • Market Valuation Potential: Despite growing institutional interest in BitZero's asset base and power-first model, the company remains undervalued relative to peers, indicating significant growth potential in the data center and crypto mining sectors, especially against the backdrop of increasing scarcity of power and computing capacity.
Yahoo Finance
8.5
06-15Yahoo Finance
Bitzero Graduates to Nasdaq with Over 1GW Data Center Capacity
  • Lease Agreement Signed: Bitzero has signed a binding 15-year lease agreement with OneQode Networks, projected to generate approximately $2.6 billion in total revenue, indicating strong demand and long-term profitability in the data center market.
  • Norway Data Center Progress: The 110MW data center in Norway is under construction and expected to be operational by 2027, with an estimated net operating income margin of 85%, potentially yielding around $151 million in annual net income for the company.
  • Finland Engineering Milestone: Bitzero completed its engineering due diligence for the 520MW data center in Kokemäki, Finland, with an initial 80MW ready for service in 2027, highlighting the company's strategic positioning in high-performance computing and AI infrastructure.
  • Renewable Energy Strategy: By situating its facilities near renewable energy sources, Bitzero aims to achieve industry-leading energy efficiency, further solidifying its competitive edge in the global AI infrastructure market.
Yahoo Finance
2.0
06-10Yahoo Finance
Bitzero Holdings Trading Resumes Announcement
  • Trading Resumption Time: Bitzero Holdings Inc. resumed trading on June 10, 2026, at 10:38:22 AM, marking the company's re-entry into the market after a halt, allowing investors to continue trading its shares.
  • Reason for Suspension: The trading halt was imposed by CIRO to ensure a fair and orderly market, reflecting the regulatory body's commitment to maintaining market stability and enhancing investor confidence.
  • Regulatory Body Role: CIRO, as Canada's national self-regulatory organization, oversees all investment trading activities, ensuring transparency and fairness in debt and equity markets, thereby improving overall market health.
  • Market Impact Analysis: The resumption of trading may influence Bitzero Holdings' stock price volatility, prompting investors to monitor market dynamics closely to adjust their investment strategies and seize potential opportunities.
Wall Street analysts forecast AIBZ stock price to rise
0 Analyst Rating
Wall Street analysts forecast AIBZ stock price to rise
0 Buy
0 Hold
0 Sell
Current: 0.000
sliders
Low
Averages
High
Current: 0.000
sliders
Low
Averages
High
No data

No data

Valuation Metrics

The current forward P/E ratio for Bitzero Holdings Inc (AIBZ.O) is 0.00, compared to its 5-year average forward P/E of --. For a more detailed relative valuation and DCF analysis to assess Bitzero Holdings Inc's fair value, Click here.

Forward PE

The forward P/E ratio is a valuation metric that divides a company's current stock price by its estimated future earnings per share over the next 12 months.
StronglyUndervaluedUndervaluedFairOvervaluedStronglyOvervalueddotted line Image
N/A
5Y Average PE
Current PE
0.00
Overvalued PE
Undervalued PE

Forward EV/EBITDA

The forward EV/EBITDA ratio is a valuation metric that divides a company's enterprise value (EV) by its estimated future earnings before interest, taxes, depreciation, and amortization (EBITDA) over the next 12 months.
StronglyUndervaluedUndervaluedFairOvervaluedStronglyOvervalueddotted line Image
N/A
5Y Average EV/EBITDA
Current EV/EBITDA
0.00
Overvalued EV/EBITDA
Undervalued EV/EBITDA

Forward PS

The forward P/S ratio is a valuation metric that divides a company's current stock price by its estimated future sales (or revenue) per share over the next 12 months.
StronglyUndervaluedUndervaluedFairOvervaluedStronglyOvervalueddotted line Image
N/A
5Y Average PS
Current PS
0.00
Overvalued PS
Undervalued PS

Financials

AI Analysis
Annual
Quarterly

Whales Holding AIBZ

Trading Trends

    Insider
    Hedge Fund
    Congress Trading

People Also Watch

Frequently Asked Questions

What is Bitzero Holdings Inc (AIBZ) stock price today?

The current price of AIBZ is 6.54 USD — it has decreased -6.7

What is Bitzero Holdings Inc (AIBZ)'s business?

Bitzero Holdings Inc. is a Canada-based provider of IT energy infrastructure and high-efficiency power for data centers. The Company focuses on data center development, Bitcoin mining, and obtaining strategic data center hosting partnerships. The Company has four data center locations in the North American and Scandinavian regions, with its primary Norway site in Namsskogan, houses its self-mining operations. Namsskogan, Norway, its 50,000 square meter (m2) Norway facility, is located in the low-cost NO4 region and the site is powered by hydro energy. The Royrvik, Norway site is leased and sits on an approximately 8,000 m2 industrial-zoned plot in the municipality of Royrvik, powered by hydro energy. The Finland site sits on a total potential plot size of around 971,500 m2 near the port city of Pori, located in western Finland.

What is the price predicton of AIBZ Stock?

Wall Street analysts forecast AIBZ stock price to fall over the next 12 months. According to Wall Street analysts, the average 1-year price target for AIBZ is USD with a low forecast of USD and a high forecast of USD. However, analyst price targets are subjective and often lag stock prices, so investors should focus on the objective reasons behind analyst rating changes, which better reflect the company's fundamentals.

What is Bitzero Holdings Inc (AIBZ)'s revenue for the last quarter?

Bitzero Holdings Inc revenue for the last quarter amounts to NaN USD, decreased

What is Bitzero Holdings Inc (AIBZ)'s earnings per share (EPS) for the last quarter?

Bitzero Holdings Inc. EPS for the last quarter amounts to USD, decreased

How many employees does Bitzero Holdings Inc (AIBZ). have?

Bitzero Holdings Inc (AIBZ) has 0 emplpoyees as of July 08 2026.

What is Bitzero Holdings Inc (AIBZ) market cap?

Today AIBZ has the market capitalization of 352.86M USD.